Hi,
Me again. I''m started to freak out a little, because a jeweler has my diamond and I''ve told him that I need it by March 15th.
He told me that I''d get a CAD on Wednesday of last week. When I called him Thursday he said that he did not like the first CAD his designer did and that he had started over. I again stressed that I needed it by the 15th and he said it would be tight, but not a problem.
I don''t want to keep bugging him, because I want him to produce good work. But it is now one week from when I need it, and I still have not seen a CAD image. What the hell.
So what should I do? Start pressuring him? Tell him I want it back? (I''ve put a 750$ deposit down BTW)
I cannot get this late as I''m leaving the country and want to propose on our vacation. I gave him the diamond with a full two weeks and two days. Am I being unreasonable? or is he slow? what do I do?
Me again. I''m started to freak out a little, because a jeweler has my diamond and I''ve told him that I need it by March 15th.
He told me that I''d get a CAD on Wednesday of last week. When I called him Thursday he said that he did not like the first CAD his designer did and that he had started over. I again stressed that I needed it by the 15th and he said it would be tight, but not a problem.
I don''t want to keep bugging him, because I want him to produce good work. But it is now one week from when I need it, and I still have not seen a CAD image. What the hell.
So what should I do? Start pressuring him? Tell him I want it back? (I''ve put a 750$ deposit down BTW)
I cannot get this late as I''m leaving the country and want to propose on our vacation. I gave him the diamond with a full two weeks and two days. Am I being unreasonable? or is he slow? what do I do?