D dallasstar12 Rough_Rock Joined Sep 17, 2009 Messages 19 Feb 3, 2010 #1 Just wondering... we have been waiting to see them on a custom design for almost 3 weeks and am starting to get a little antsy. Does this seem like an uncharacteristically long time to wait or is this normal?
Just wondering... we have been waiting to see them on a custom design for almost 3 weeks and am starting to get a little antsy. Does this seem like an uncharacteristically long time to wait or is this normal?
Maisie Super_Ideal_Rock Joined Dec 30, 2006 Messages 12,592 Feb 3, 2010 #2 Have you contacted the vendor to ask when they will be done? I think I waited around a week or so when I worked with Whiteflash.
Have you contacted the vendor to ask when they will be done? I think I waited around a week or so when I worked with Whiteflash.